Medium Voltage Jointing – Water Treatment Facility

Client: PT Air Batam Hulu

Location: Batam

This project involved medium-voltage (MV) cable jointing work to support the electrical supply system of a water treatment facility. The scope included preparation, termination, and connection of MV cables to ensure uninterrupted and safe power delivery to critical utility infrastructure. Executed in compliance with industry standards for insulation and protection, the work enhanced the system’s reliability and operational efficiency at the water treatment facility.